Find out what you can build in your backyard.
Free ADU site check for Ventura County homeowners. What fits on your lot, a written cost range, and how permits work.
Concept renderingYou're on the list.
Adam will call within one business day to go over your lot and set up the site check.
Want to talk sooner? Call or text (805) 222-6544, Mon to Sat, 8am to 6pm.
Concept imageWhat the free site check tells you
What fits on your lot
Size, placement and setbacks under California and city rules, plus whether a garage conversion or detached unit makes more sense.
A written cost range
Based on your actual site, not a national average. Utilities, slab and access are the things that move the number.
The permit path
Which department reviews it, what plans you need, and a realistic schedule. We handle the submittal and plan check.
From site check to move-in







Illustrative images of a typical ADU build.
What ADUs cost in Ventura County
Planning ranges from our cost model (Simi Valley, ZIP 93065) with standard finishes. Your site check turns this into a number for your lot.
Model examples as of September 16, 2026: one bathroom per unit, laundry, private entrance, flat lot. Not a quote. Plans, engineering, agency fees and unusual site work are confirmed in a written proposal after we see the property.
Start to keys, one licensed team
Free site check
We look at your lot and goals and tell you what's possible.
Design and plans
A floor plan for your lot and budget, with engineering.
Permits
We submit to the city or county and handle plan-check revisions.
Build and handover
Our crew builds it, passes final inspection, and walks you through it.
What Safeway clients say
Adam and Mo were great to work with every step of the way.Sue F. · Kitchen remodel · Yelp
Price was good, service top notch.Kim S. · Bathroom remodel · Yelp
Professional, timely, and very focused to get the work done.Chris A. · General remodeling · Yelp
Reviews from Safeway remodeling clients. Read them all on Yelp
Common questions
Will my lot qualify for an ADU?
Most single-family lots in California can add one. State law allows side and rear setbacks as small as 4 feet. Easements, slopes and utilities are what the site check confirms.
How long does it take?
Cities must act on a complete ADU permit application within 60 days. Design and engineering come before that. Active construction usually runs 4 to 5 months for a garage conversion and 6 to 11 months for a detached unit.
Do you handle the permits?
Yes. We prepare and submit the permit package, respond to plan-check comments and schedule the inspections, in Ventura County and Los Angeles County.
Is a garage conversion cheaper?
Usually, because the walls, roof and slab already exist. The slab, framing, moisture and utilities still need to be checked before we can confirm it.
What does the site check cost?
Nothing. It's a free visit and conversation with no obligation to build with us.